Read more on this

Read more on this

Waste to Energy Plant proposed at ‘A303 Enviropark’ , Barton Stacey

by Jackie Porter on 4 March, 2019

This is an artist’s impression of the proposed incinerator, generating 51mW from 450,000 tonnes of industrial waste

There is a proposal to build an industrial incinerator/energy from waste plant at Barton Stacey. There is no planning application yet.

As a National Infrastructure Project, it will be managed by the Govt Planning Inspectorate, but HCC will be a consultee. I understand it is likely to be proposed as an application late 2019/early 2020, maybe later. Four county divisions are affected and having had initial discussions, I am hoping that we will be able to work cross party on a response.See more at https://infrastructure.planninginspectorate.gov.uk/projects/south-east/wheelabrator-harewood-waste-to-energy-facility/

Initial consultation runs until the 22ndMarch. go to Wheelabrator’s website for explanations and forms

Wheelabrator, with experience of energy from waste construction, are proposing to build a new waste-to-energy plant for industrial waste at the ‘A303 Enviropark’  at  Barton Stacey.

It is proposed that the energy generated will power 110,000 homes from 450,000 tonnes of waste.

You can see more here.

www.wtiharewood.co.uk

 

 

 

   Leave a comment

Leave a Reply

You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>